Skip to content
AWA-FROG LOGO ONLY 630 Pixel

Formline Architecture + Urbanism

  • Projects
  • Studio
    • About Us
    • Our Team
    • Our History
    • Awards
  • News
    • Press
    • Our News
    • Videos
  • Careers
  • Contact
  • Projects
  • Studio
    • About Us
    • Our Team
    • Our History
    • Awards
  • News
    • Press
    • Our News
    • Videos
  • Careers
  • Contact
  • Projects
  • Studio
    • About Us
    • Our Team
    • Our History
    • Awards
  • News
    • Press
    • Our News
    • Videos
  • Careers
  • Contact

< Back to Projects

Natural Research Council Canada Path to Healthy Housing

Déline, NWT

Formline Architecture is one of 4 Indigenous lead architectural teams working with Natural Research Canada to develop proto-type housing for Indigenous communities in remote regions of Canada. Déline is a community of 500 located on the south west arm of Great Bear Lake in Canada’s sub arctic. There is no permanent road access and only ice road access to the communities in the winter. This region of Canada is in the permafrost zone requiring buildings to be raised off the ground by a metre to ensure ground conditions are not affected.

The focus was on a stand-alone house modifiable for a single stand alone, duplex, or quadplex arrangement designed to passive house standards to reduce fossil fuel usage. The community electrical power is provided by a diesel generator, heating by oil-fired furnace and each building has its own water holding tank and septic tank.

The resultant proto-type includes the typical layout of a one bedroom unit with a compact kitchen bathroom core to minimize plumbing runs, a porch transitional space and an oversized mechanical room providing space for the 350 gallon water tank, furnace and space for a chest freezer for wild game and seasonal clothing and a tepee for outdoor cooking.

The form and character merges the community’s affection for the log cabin combined with an open translucent shed garage and storage area. The corrugated translucent shed structure relates to the translucent tepee. Current plans are to build 10 units at a deserted runway.

Awards

Client

Natural Resource Canada c/o David Fortin Architect

Completion

Un-built

Size

75 

m2
 / 807 ft2

Formline Team

Alfred Waugh, Henry Dyck, Nik Langroudi

Photography Credit

Related News

View More Projects

Liard River Hot Springs Replacement Facility

Liard River, BC

McLeod Lake Tse’khene Cultural Centre

McLeod Lake, BC

Dzee Ba’Yugh Heart House

Lake Babine Nation, BC

Squaxin Island Natural and Cultural Resource Centre

Shelton, WA

Barkerville Indigenous Cultural Centre

Barkerville, BC

Ts’ewulhtun Health Centre

Duncan, BC

Minnkannens Social Enterprise and Economic Development Hub SEED

Muncey, ON

OAC VAW Inuit Women’s Shelter

Ottawa, ON

Elliott Bay Pavilion

Seattle, WA

Capilano University Aboriginal Gathering Place

North Vancouver, BC

Nicola Valley Institute of Technology

Merrit, BC

Lhtako Dene Cultural Centre

Quesnel, BC

Neah Bay School

O’Siyam Pavilion

Squamish, BC

Wellness House

Victoria, BC

New Central Library

Saskatoon, SK

Mi’kmawey Debert Cultural Centre

Debert, NS

BCIT Aboriginal Gathering Place

Burnaby, BC

Lake Country Indigenous Cultural Centre

Lake Country, BC

Dha’Yaci Big House

Bella Bella, BC

Studio

207-267 Esplanade West
North Vancouver, BC
V7M 1A5
info@formline.ca
604-912-0203

Headquarters

807-100 Park Royal South
West Vancouver, BC
V7T 1A2
info@formline.ca
604-912-0203

Land Acknowledgment

We respectfully acknowledge that our offices are located on the traditional and unceded territories of the Sḵwx̱wú7mesh (Squamish) Nation.

IG logo
LinkedIn Logo

2024

Formline Architecture + Urbanism

Design: Suhani Syal
Development: Pureze Web Media

Privacy Policy